A two-story 6,000 SF bearing wall system office building utilizing concrete masonry and steel stud walls, composite steel floor deck on structural steel floor beams, and steel roof deck over open web steel roof joists. Wall finishes include brick veneer, ceramic tile, and stucco.
20,000 SF Magnet High School with a classroom building, administration building and gymnasium. All three buildings utilize pre-manufactured metal buildings on reinforced concrete metal building foundations.
This community development located in Tucson, Arizona is comprised of Twenty (20) 1,800-2,200 SF two-story single-family residential units. Four (4) individual "model" units with optional features were designed for the Client providing multiple choices for prospective buyers. All units utilize wood frame construction and post-tensioned concrete slab-on-grade foundations.
Concrete masonry retaining wall structures for the site of the La Paloma Office Complex located in northwest Tucson, Arizona in the foothills of the Catalina mountains. The site is just across the road from the beautiful Westin La Paloma Resort and Spa.
Rolled/Radiused structural steel members were utilized to achieve the desired architectural attributes. Structural analysis and design were performed using 3d finite-element modeling.
Kaiser Structural, Inc. provided reinforced concrete and reinforced concrete masonry special inspection services during construction of this essential municipal facility. Services were performed for the Northwest Fire District in Marana, Arizona.
Kaiser Structural, Inc. provided post-tensioned concrete special inspection services for this breathtaking 6-story golf resort hotel and spa located in the foothills of the Tucson Mountains near the western edge of Tucson, Arizona.
|